![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-13.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-5-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-4-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-9-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-11-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-7-1-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-6-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/Plant-Pictures-8-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/DJI_0025-scaled.jpg)
![](http://gaenergy.com/wp-content/uploads/2023/02/DJI_0033-scaled.jpg)
Plant Pictures 13
Plant Pictures 5
Plant Pictures 4
Plant Pictures 9
Plant Pictures 11
Plant Pictures 7
Plant Pictures 6
Plant Pictures 8
DJI_0025
DJI_0033
GUL AHMED ENERGY LIMITED
Gul Ahmed Energy Limited is a 136.17 MW thermal power plant located in the Korangi Industrial Area of Karachi. The plant was set up on 20th July 1994, being the brainchild of (Late) Mr. Iqbal Alimohamed – the founder and former Chairman of Gul Ahmed Energy Group. Over 25 years of operations have successfully been completed.
The thermal power plant was setup on a Build Own and Operate (BOO) basis. The plant is currently being operated by Gul Ahmed Energy Group, with an Operations & Maintenance team under the supervision of technical professionals having experience of over 30 years in the energy sector.